Skip to content

Driveway Replacement

Block Paving Removal & Resin Replacement in Brentwood

Old blocks lifted, the base checked and corrected, then a permeable resin surface laid to last.

  • Itemised Quote
  • Base Inspected First
  • SuDS Compliant Finish
A large red brick detached house with a newly installed grey resin bound driveway, a wooden porch, and a wooden gate.

What Goes Wrong

Why rushed block paving replacements fail, and what the correct approach looks like

Resin Over Old Blocks

Laying resin directly over block paving traps jointing sand and uneven surfaces beneath, preventing a consistent bond and causing early delamination.

Full Removal First

Lifting the blocks entirely exposes the sub-base so its condition is known before any new material is committed to the job.

Unchecked Sub-Base

Essex clay soils shift over time, leaving soft spots and compaction failures that cause a new resin surface to sink or crack within months.

Base Repair & Recompaction

Soft spots and failed areas are reinstated to a compacted MOT Type 1 sub-base before the resin surface is applied.

Wrong Drainage Fall

A surface laid over an incorrect fall will pond water regardless of how well the resin is mixed or trowelled, the gradient is the fix, not the finish.

Falls Corrected at Base Stage

Drainage falls are measured and corrected during base preparation, so the finished surface sheds water to the correct point.

Neglected Edge Restraints

Resin surfaces without properly reinstated kerb lines and edge restraints spread at the margins, losing definition and allowing the surface to lift.

Kerb & Edge Reinstatement

Edge restraints and kerb lines are reinstated or replaced as part of the preparation scope, not treated as optional extras.

Block Paving Replacement

Why the sub-base check matters when replacing block paving with resin

Lifting old blocks reveals what is underneath, and that is where the outcome of the new surface is decided.

Block paving that has shifted, settled unevenly, or become overrun with weeds is a common sight on older Brentwood driveways. Laying resin directly over existing block paving is not a sound approach, the uneven surface and jointing sand beneath prevent a consistent bond. Removal is the correct starting point, and it has a practical benefit: it exposes the sub-base so its condition can be assessed properly before any new surface is committed to.

Once the blocks are removed, the sub-base is inspected for soft spots, compaction failure, and drainage fall. Essex clay soils can cause sub-base movement over time, and any areas that have shifted need reinstating before the resin surface is laid. Drainage falls are checked and corrected at this stage, a surface laid over an incorrect fall will pond water regardless of how well the resin itself is applied. Edge restraints and kerb lines are reinstated or replaced as part of the preparation.

With the base confirmed as sound and correctly graded, the resin bound surface is applied over the prepared area. The permeable finish drains surface water through the layer, meeting SuDS requirements for front driveways. Front driveways in Brentwood are visible from the street, so edge finish and kerb reinstatement are included in the scope, not treated as optional extras. The full sequence, from block removal to finished surface, is set out in the quote before work begins.

Why Choose Us

Why choose us for block paving removal & resin replacement in Brentwood?

Every stage of this job, removal, base repair, drainage correction, and resin finish, is quoted and managed as a single accountable scope.

  1. Itemised Quote, Stage by Stage

    Excavation, sub-base, edge restraints and resin bound finish appear as separate lines so you know exactly what each stage costs.

  2. Base Assessment Before Commitment

    The sub-base is inspected after removal and before any price is fixed for the resin stage, no surprises once work is underway.

  3. Assessed Before Any Quote

    We schedule assessments for Brentwood driveways that account for Essex clay sub-base conditions.

  4. Drainage Fall Included in Scope

    Correcting drainage falls is part of the quoted work, not an add-on raised after the blocks are already lifted.

  5. Edge & Kerb Finish Covered

    Kerb reinstatement and edge restraints are included in the scope from the outset, keeping the street-facing finish clean and defined.

A newly installed grey resin-bound driveway with a central decorative pattern leads to a modern double garage.
A modern brick house with a newly installed dark grey resin driveway, landscaped front garden, and an oak timber porch.

The Process

From first enquiry to finished resin driveway

  1. Describe Your Driveway

    Tell us the area size, what block paving is down, and how it currently drains so the right specialist can be arranged.

  2. Survey & Itemised Quote

    An on-site visit assesses the sub-base, measures drainage falls, and quotes each stage as a separate line item.

  3. Removal, Prep & Resin Finish

    Blocks are lifted, the base inspected and repaired, drainage corrected, then the resin bound surface is trowelled and cured.

Pricing Estimates

Typical Block Paving Removal & Resin Replacement Prices

JobTypical cost
Small removal and replacement£2,500-£4,000
Average driveway replacement£4,500-£7,000
Large driveway replacement£7,000-£10,500
Removal with full new base£8,000-£12,000
These prices are estimates and often vary with the condition, size and scope of each job. Message us for a free, no-obligation quote.
See all prices

Common Questions

Questions about replacing block paving with resin

  • Do the old blocks need to be taken up before the resin can go down?

    In most cases, yes. Block paving is lifted and removed so the base beneath can be inspected and prepared properly. Laying resin over blocks that may be uneven, loose or sitting on a compromised sub-base risks the finished surface failing early. A clean, stable base is what makes the resin last.

  • Can resin go straight over block paving?

    It can, but only if the blocks are fully stable, level and firmly bonded to a sound sub-base. Where blocks are loose, sunken or the base is damaged, overlaying simply traps the problem underneath. Full removal and replacement gives a more reliable result in most real-world driveways. See resin overlay on existing surfaces for cases where overlay is suitable.

  • What happens if the base under my driveway is damaged?

    The damaged section is excavated and a new compacted sub-base is laid before any resin goes down. Skipping this step means the resin surface will crack or sink in the same spots as before. Sub-base repair is quoted as a separate line item so you can see exactly what is being done and why.

  • Will you check for hidden damage under the old blocks before starting?

    Yes. Once the blocks are lifted, the sub-base is assessed for soft spots, voids and drainage issues before any further work begins. Any problems found are quoted separately so you know the scope before the job continues. Nothing is covered over without being addressed first.

  • If my driveway already cracks or sinks, can this still be done properly?

    Yes, and this is exactly the situation where full removal and replacement makes most sense. The blocks come up, the cause of the cracking or sinking is identified and the sub-base is repaired before the resin is laid. Addressing the root cause is what stops the same problem recurring.

  • Will this stop puddles and standing water on my driveway?

    Resin bound surfacing is permeable, so water drains through the surface rather than pooling on top. Provided the sub-base and drainage are set up correctly during installation, standing water should not be an issue. Puddles on block paving are usually caused by sunken blocks or blocked joints, both of which are resolved by starting fresh.

  • Do you sort out the drainage as part of the work?

    Drainage is assessed and addressed during the base preparation stage. Because resin bound surfacing is permeable, water passes through to the sub-base and disperses naturally. Where existing drainage channels or gullies need repositioning or clearing, that work is included in the scope and quoted as a separate line item.

  • How much of the old driveway gets removed?

    Typically the full surface area is cleared: all blocks, bedding sand and any failed sub-base material. The depth of excavation depends on what is found underneath, but the goal is to reach stable, compacted ground before rebuilding. Your itemised quote will show excavation as its own line so the scope is clear.

  • Which areas do you cover for Block Paving Removal & Resin Replacement?

    We cover Block Paving Removal & Resin Replacement in and around Brentwood, including Shenfield, Hutton, Ingatestone, Billericay, Mountnessing, Stock, Doddinghurst and West Horndon. If your area isn’t listed, send us a quick message to check.

Tell Us About Your Driveway

Describe the area, what is down there now, and how it drains. We’ll schedule an assessment of the base and quote every stage separately.

Start Your Enquiry